Itinerary

 Date

 Itinerary

 Overnight
7 May,
Sunday
 7:00PM: Assemble at Hotel Carrera for introductions, logistics, and safety discussions. Hotel Carrera Girón Velarde 123Lince, Lima Sra. Elva Córdoba
8 May, Monday  8:00AM: Depart Lima for San Ramón; transect across central Andes and discussion of Andean structures and ore deposits San Ramón
9 May, Tuesday  8:00AM: visit San Vicente MVT Zn deposit Ing. Miguel Montestruque and Ing. Román Tejada San Ramón
10 May, Wednesday Travel to La Oroya for afternoon visit to smelter complex operated by The Doe Run Company La Oroya
11 May, Thursday 6:00AM: Depart La Oroya for Yauliyacu (formerly Casapalca) porphyry-replacement-vein system
Dr. Michael Steinmann
Lima
12 May, Friday 8:00AM: visit Chosica volcanic-hosted massive sulfide prospects east of Lima. Hotel Carrera, Lince, Lima
13 May, Saturday 8:00AM: Travel to Mala, visit Raúl-Condestable Cu-Fe-Au vein-replacement system. Ing. Julio Zuñiga A., Mina Condestable Hotel Carrera, Lince, Lima
14 May, Sunday Travel to Arequipa; evening discussion of leached capping mineralogy and the geology of the southern Perú porphyry copper province. Arequipa
15 May, Monday 9:00AM: Leave Arequipa for Moquegua; transect across Incapuquio Fault Zone Moquegua
16 May, Tuesday 8:00AM: Visit Cuajone porphyry Cu-Mo system Ing. Rubén Mattos Pino Moquegua
 7 May, Wednesday 9:00AM: Return to Arequipa; via Cocachacra Cu-Au prospect? Arequipa
18 May, Thursday  8:00AM: visit Cerro Verde District porphyry Cu-Mo system, and leached capping exercise at Cerro Negro. Jim Jones and David Braxton, Minera Cerro Verde Arequipa
19 May, Friday Course ends; participants return to Lima